Engineering Projects in Holly Springs
The department also oversees projects for which developers are responsible under Town regulations.
Town of Holly Springs Engineering Projects
-
Transportation Bond Projects
Information on projects funded by transportation bonds. Two categories of projects include fully bond-funded projects with shorter turnaround times (green projects) and larger projects that would require additional funding from the N.C. Department of Transportation and other sources.
Link to page -
Apex Meter Vault Replacement
Installing a new water meter to allow accurate measurement of water usage
Link to page -
Avent Ferry Road Widening, NC 55 to Ralph Stephens
Completing the widening of Avent Ferry Road from NC 55 to Ralph Stephens Road
Link to page -
Avent Ferry Road Widening, R. Stephens - Cass Holt
Widening Avent Ferry Road from Ralph Stephens Road (formerly Piney Grove Wilbon Road) to Cass Holt Road
Link to page -
Avent Ferry Sewer Force Main Upgrade
Replacing about 8,500 linear feet of existing 8-inch sewer force main with larger 18-inch line to provide additional system capacity and improve efficiency of nearby sewer pump station.
Link to page -
Ballentine Traffic Signal
Installing a traffic signal at the intersection of South Main Street and Ballentine Street to improve traffic flow and safety.
Link to page -
Bicycle Safety Improvements
Adding share-the-road markings and signage along two miles of roadway.
Link to page -
Holly Springs Road Widening (Main to Flint Point)
Widening Holly Springs Road from Main Street to Flint Point Lane to a median-divided, four-lane road with sidewalks.
Link to page
-
Main Street Sidewalk North
Adding a 5-foot-wide sidewalk along Main Street for about 2,040 feet, connecting Ting Park and the Oak Hall neighborhood.
Link to page -
Omni Pump Station Removal
Removing an aging sewer pump station from along Main Street.
Link to page -
School Days Lane Waterline
Adding about 1,100 feet of 16-inch diameter water line to the water tank off Holly Springs Road, improving system-wide performance and emergency connections with neighboring towns.
Link to page -
Sportsmanship Way Connection
Providing a connection between N.C. 55 and Sportsmanship Way at Ting Park
Link to page -
Sugg Farm Road and Utilities Improvements
Completed upgrading/extending water and sewer lines into the park. Future work includes widening and replacing the park road.
Link to page -
Sunset Lake Road Sidewalk
Connecting the sidewalk south of the Wescott subdivision with the sidewalk north of Optimist Farm Road and installing a pedestrian signal.
Link to page -
Utley Creek Greenway
Connecting west and east Holly Springs, from West Ballentine Street near the Oaks of Avent Acres club house, along an existing greenway, through an existing pedestrian tunnel under NC 55, to the Morgan Park greenway.
Link to page -
Bids & Proposals
Current requests for bids and proposals
Link to page
The N.C. Department of Transportation is responsible for construction and maintenance of most major roads in Holly Springs. Changes to state-maintained roads require DOT approval.
Requests for Proposals & Qualifications
The Town invites qualified firms and professionals who are interested in providing construction work and civil engineering services to be included in the databases we use for invitations to work with us. Click here for more information.-
Engineering
Physical Address
128 S. Main Street
Holly Springs, NC 27540
Mailing Address
P.O. Box 8
Holly Springs, NC 27540
Phone: (919) 557-3938Fax: (919) 552-9881
-
Kendra Parrish
Engineering DirectorPhone: (919) 557-3935